Applications
Flue paths, boiler and oven doors, exhaust elbows, duct connections, manhole covers and local refractory lining repairs.
Selection and preparation
Identify the gas path and substrate. Remove loose material and contaminants. Confirm joint movement, putty thickness, drying and controlled heat-up requirements with the current manufacturer instructions.
Service limits
Select for gas-side and refractory work. Do not treat the heat-resistance statement as a water/steam pressure rating. Request current technical documentation and pack details before specifying.

